Kachanov Associated Gas Capture and Utilization

Sector

Crude oil production with associated gas

Proponent/project Owner

State-owned enterprise OJSC “Nafta”, Poltava oblast, Glynsko-rozbyshev Field Kachanov gas processing works.

Background

An analysis of energy resources and energy saving potential for the Gadiach district reveals large opportunities for generating electricity using associated gas. Approximately 50,000 m3 of associated gas are flared daily at the Glynsko-rozbyshev field, which amounts to 18.25 million m3 per year.

Project Goal and Ghgs Targeted

Use associated gas to produce low-cost heat and electric power, and reduce CO2 and CH4 emissions into the atmosphere by displacing production from existing plants.

Technical Summary

Installation of gas and diesel generation units to use associated gas from Kachanov gas processing works to produce 60 million kwh of electricity per year. The estimated annual natural gas savings in Gadiach district are around 15 million m3. The annual reductions of GHG emissions are estimated at 591,000 tons of CO2 equivalent. The project lifetime is 10 years.

Estimated Cost

The preliminary cost estimate is $3 million, including $2.5 m. for generation units, $100,000 for other equipment procurement, $350,000 for start-up and adjustment. The project payback time is estimated at 2 years.

Status and Financing

The project needs а pre-feasibility study and the proponent welcomes investment proposals.

Contact Information

Interested parties should contact the CCI Project Center in Kyiv, or

Mr. Grygory I. Savchenko, Kachaniv, Gas Works Director, at
tel. (3805354) 20-574, or
Dr. Vadym S. Stogniy, Director of Center of Ukrainian Office “International Center of Science Culture – World Laboratory” at:
tel. (38044) 216-69-40, fax. (38044) 216-70-12